top of page
2.jpg

Electricity Program

It lasts 10 months (42 weeks) and consists of two phases:
- Residential Electricity.
- Commercial Electricity.


The Residential Electricity phase consists of 6 Certificates:
1- Residential electrical installation.
2- Backup power generators.
3- Solar panels.
4- Smoke/carbon monoxide detectors and plans.
5- Estimates/calculations of load and multimedia wiring.
6- Introduction to Commercial Electricity.

The Commercial Electricity phase consists of 4 certificates:

1- Commercial electrical installation.
2- Commercial electrical plans.
3- Commercial panel boards and transformers.
4- Commercial protection against overcurrent and short circuit.

ELECTRICITY

Upon completion of the program, she receives diplomas that are valid nationwide and also her first license that accredits her as an Electrical Technician. Classes are in Spanish with English terminology.

bottom of page